Skip to main content

Bordentown Regional Middle School

Tradition Built and Future Focused

October 15th Referendum Update

Posted Date: 10/15/26 (03:30 PM)

A network of insulated pipes with labels such as 'HEATING WATER SUPPLY' runs across a ceiling.

A bucket stays strapped to a leaking hot-water pipe at MacFarland Intermediate School. The leak is one of many chronic building issues throughout the Bordentown Regional School District. 

The Nov. 3 bond referendum includes replacing HVAC and plumbing components at all schools. The proposed work would address aging infrastructure and reduce the need for stopgap fixes like the one shown here.

Learn more about the projects proposed for each school at bordentown.k12.nj.us/vote.

#BordentownRegional #VoteNovember3